Le contenu de l'apprentissage est conçu pour tous ceux qui souhaitent acquérir des connaissances sur SAP d'une manière simple, compacte et pratique. Notre plateforme d'apprentissage propose des contenus pour les débutants, les apprenants avancés et les experts. Cela vous permet d'élargir vos connaissances étape par étape et de développer continuellement vos compétences pour devenir un expert SAP.
Demand-Driven Replenishment in SAP Purchasing (MM)
Taux forfaitaire
19 € par mois
Licence unique Plus de 1000 livres électroniques et tutoriels vidéo Accès instantané 12 mois(228 €par an) renouvellement automatique
Plus de détails
If goods and services are not available in sufficient quantity, this can stop production and have a corresponding negative impact on sales. However, high warehouse stocks also tie up capital and cause costs. This book on consumption-based material requirements planning (MRP) will help you to manage this conflict of interests. Despite materials required having different procurement lead times and specific storage properties, you can and must be able to respond to individual requirements. Using processes and examples from practice, you will learn how the consumption-based MRP procedures in SAP MM can support you in these tasks. This book is aimed at both beginners in the topic, as well as key users who want to familiarize themselves with basic customizing settings.
- Reorder point planning, stochastic and time-phased MRP
- Material master data, including lot sizes and how to calculate them
- Planning, planning process, stock/requirements lists (transaction MD04), and forecasts
- Customizing of the basic settings and processes
Exemple de lecture
2.1 Manual reorder point planning
2.1.1 Definition
In manual reorder point planning, the SAP system compares the anticipated available stock with the reorder point in the material master. Using the MRP indicator VB in the material master, you assign the MRP procedure to the material (see Figure 1.4). With this type of MRP, you maintain the reorder point and the safety stock manually in the MRP 1 (reorder point) and MRP 2 (safety stock) (see Section 3.1) views.
The reorder point
The reorder point is a stock quantity. When this quantity is reached, or if the level of stock falls below this quantity, procurement should be triggered to ensure that the material is always available in sufficient quantity during the procurement process.
The safety stock
The safety stock is used to bridge the material requirements in the event of any delay in procurement (delivery delay or problems during production). It is part of the reorder point.
When the reorder point is reached or the stock available falls below this level, more of the material should be ordered. In an ideal situation, the goods receipt should be posted when the safety stock level is reached (see Figure 2.1).

Figure 2.1: Procurement in reorder point planning
To determine the reorder point, you need the safety stock, the replenishment lead time, and the consumption during the replenishment lead time. You use the following formula to calculate the reorder point:
Reorder point = safety stock + (daily requirement × replenishment lead time in days).
The safety stock figure and the reorder point come from the material master.
2.1.2 The replenishment lead time
The replenishment lead time is made up of the purchasing department processing time (set in the plant parameters in Customizing, see Section 8.2), the planned delivery time (material master), and the goods receipt processing time (material master), as shown in Figure 2.2.

Figure 2.2: Replenishment lead time
You maintain the purchasing department processing time in workdays. This figure indicates the time that the buyer needs to convert a purchase requisition from MRP into a purchase order. You maintain the figure in the plant parameters in Customizing as follows: Materials Management • Consumption-Based Planning • Plant Parameters • Carry Out Overall Maintenance of Plant Parameters, setting it at plant level (for the setting, see Figure 2.3). This time is not dependent on the material, as in principle, the same effort is required regardless of whether the order is for 100 tons of gravel or one screw.

Figure 2.3: Purchasing department processing time
The planned delivery time is the time that the supplier needs to deliver the material. For material produced in-house, this time is the time required for in-house production. In the material master, this field must be defined as a mandatory field. In contrast, in the purchasing info record, you can maintain a separate planned delivery time in the purchasing organization data for the combination of supplier, material, purchasing organization, and plant. For example, to deliver to a plant in Berlin, a supplier needs one day to deliver to a plant in Heidelberg, the supplier needs three days. If the planned delivery time in the material master has different values to the planned delivery time in the purchasing info record, the rule “from specific to general” applies (see Figure 2.4).

Figure 2.4: Planned delivery time in the material master and purchasing info record
Due to the combination of material and supplier, the purchasing info record is the more specific master record. Therefore, to calculate the replenishment lead time, the value for the planned delivery time is taken from this master record. You maintain the planned delivery time in calendar days. This is because, for example, the transport of goods from abroad by ship does not stop at weekends or on public holidays.
You enter the goods receipt processing time in the material master record in the Purchasing view under Other Data (see Figure 2.5).

Figure 2.5: Goods receipt processing time
This value indicates the time required after delivery to check the material and transfer it to stock. The goods receipt processing time is specified in workdays because the goods receipt department is active only on these days.
2.1.3 The net requirements calculation
With the net requirements calculation, the SAP system checks whether a procurement proposal should be created in MRP at all. To do this, the system compares the reorder point with the anticipated warehouse stock (stock, purchase order, production orders, etc.) available. If the reorder point is the higher number, there is a material shortage. In this case, a procurement proposal is created for the previously defined lot size (see Section 3.1.2) (see Figure 2.6).

Figure 2.6: Net requirements calculation in manual reorder point planning
The anticipated warehouse stock available is made up of the warehouse stock and the open purchase order quantity (total). In Customizing, you use the plant parameters to define whether the following are also deemed to be anticipated available stock:
- Stock in transfer
- Blocked stock
- Restricted-use stock
If these stocks are deemed to be anticipated available stock, they are added to the warehouse stock (see Chapter 8, Customizing).
The open purchase order quantity (total) includes the quantities from:
- Purchase orders
- Fixed purchase requisitions
- Fixed planned orders
With regard to fixed purchase requisitions and planned orders, this means that these will definitely be converted into purchase orders and production orders. Furthermore, a planning run will no longer change the quantity or the scheduling for these items. However, you can still change them manually. You can recognize the fixing in the documents by the fixed ID indicator (Fixed ID) in the stock/requirements list, and the * (asterisk) behind the document number (see Figure 2.7).

Figure 2.7: Fixing of a procurement element (here, a purchase requisition)
2.1.4 Scheduling in manual reorder point planning
With manual reorder point planning, we know the time at which a procurement proposal is created: when the stock falls below the reorder point. The system now uses the replenishment lead time with forward scheduling to calculate when the material will be available: the availability date. Starting with the release date (the date on which a—where necessary, released—purchase requisition that can be converted into a purchase order is available), the purchasing department processing time is added. This produces the purchase order date, that is, the date of the purchase order. In the next step, the planned delivery time from the material master record or the purchasing info record is added to the purchase order date to produce the goods receipt date. Bringing the material to the respective storage location, checking the goods, and posting them to the SAP system takes further time, and therefore the defined goods receipt processing time is added. This produces the availability date: the date on which the material is posted and is available for further processing (see Figure 2.8).

Figure 2.8: Forward scheduling
The supplier is not generally defined yet when you perform the scheduling in the planning run. Therefore, the planned delivery time from the material master is used for the calculation. For the planned delivery time from the purchasing info record to be used, the supplier must already be known when the planning run is executed. To reflect this process, the purchasing info record must be maintained in the source list as the unique source of supply and must be marked as relevant for MRP (see Section 3.2.2).
FréquemmentQuestions posées
Questions et réponses générales sur notre contenu d'apprentissage.
Nos produits, qu'il s'agisse de livres, de vidéos ou de formations en ligne, transmettent les connaissances SAP de manière concise et pratique, afin que vous puissiez les appliquer directement dans votre travail quotidien, même si vous disposez de peu de temps. Vous bénéficiez d'une large couverture des sujets SAP pertinents, d'un contenu de haute qualité en quatre langues et de formats d'apprentissage conçus pour répondre à vos besoins individuels. Cela vous permet de rester à jour et de développer continuellement votre expertise.
Nos livres se caractérisent par une orientation pratique claire et une présentation compacte et facile à comprendre. Nous expliquons les sujets SAP complexes de manière concise - sans termes marketing inutiles - afin que les lecteurs puissent rapidement saisir l'essentiel et appliquer directement les nouvelles connaissances.
Nos livres imprimés peuvent être retournés dans les 14 jours, dans leur état d'origine. Les frais de retour sont à votre charge.
Nous n'expédions actuellement les livres qu'en Allemagne. Si vous commandez depuis l'étranger, nous vous recommandons de passer par Amazon. Vous trouverez le lien en sélectionnant "Buy eBook" sur n'importe quel produit de notre boutique en ligne. Amazon vous indiquera alors les versions eBook et imprimées disponibles à l'achat.
Vous pouvez également accéder à l'ensemble de notre contenu par le biais d'un abonnement numérique, à partir de 19 dollars par mois.
Notre équipe est toujours heureuse de vous aider et répondra à vos questions le plus rapidement possible (généralement dans les 1 à 2 jours). Vous pouvez également nous contacter si vous avez des questions à poser à l'un des auteurs. Courriel : contact@espresso-tutorials.com